Collection › LCMS Convention Proceedings (St. Louis, Missouri) › 1923 · 32nd Convention, Fort Wayne › Page 20
LCMS Convention Proceedings St. Louis, Missouri — 1923, Page 20
front matter 1
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
Page 64
Page 65
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 94
Page 95
Scan: The Lutheran Church—Missouri Synod
⤓ Download page image (full resolution)
Transcription machine transcription, uncorrected
Present cost of labor and material, Mr. Klauder Promised that he
-in addition to the library ($87,000), more than $125,000 subscribed,
housed in buildings which will be not only distinctive and pleasani
“pproved by the directors of the League. As a result of this arrar’
Ment there were obtained, during the next months, more th
$100,000 in definite pledges. j
Preliminary drawings and specifications for the lecture hall, a
ministration, auditorium, library, dining-halls, and service builgé:
was: $760,000, - (Since these figures were submitted, there has
another rise of Prices of labor and materials.) To these amoyy,
must be added the power plant with equipment, twelve residencg
a hospital, tunnels for heating-pipes, ete., other outside work and
grading, and other items, on
It was resolved that a joint meeting of the Board of Directo;
with the officers of the L. L. L., the faculty, and the Building Con
mittee be held February 27,
these buildings was $791,000, The earlier estimate on se
At this meeting the situation was again thoroughly gone oy,
and the large gathering, composed of synodical officers and busin,
men of distinction from al] parts of our Synod, endorsed the work:
80 far done by the Building Committee; Since it would be impossib
_to collect the complete amount needed for our Project before Syn
meets, it was resolved that the architect be instructed to submit oth
plans by which it would be possible to construct the buildings neces:
sary for this 8Toup at a cost of one million and a half. The Com:-3
mittee was much pleased to note the spirit in which the architect m :
the situation at Present confronting our Committee, While recoge'g
nizing the difficulty of providing, for the maximum sum mentioned,
®& permanent, practical, and distinctive group for 400 students af the
would make a sincere effort to Provide presentable drawings of
& group not to exceed in cost $1,500,000 for buildings only.
During the following weeks the efforts towards obtaining dona-
‘tions in large amounts were continued. Ag a result, there are now,
which will be availablé if the first designs are adopted, — the expre
sion of a wish, on the part of these donors, that our institution be:
to the eye, but, above all, fire-proof and hence low in cost o:
maintenance, _ ,