front matter 1 Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80 Page 81 Page 82 Page 83 Page 84 Page 85 Page 86 Page 87 Page 88 Page 89 Page 90 Page 91 Page 92 Page 93 Page 94 Page 95

Scan: The Lutheran Church—Missouri Synod

⤓ Download page image (full resolution)

Transcription machine transcription, uncorrected

⤓ Download .txt · copy text

Present cost of labor and material, Mr. Klauder Promised that he

-in addition to the library ($87,000), more than $125,000 subscribed,

housed in buildings which will be not only distinctive and pleasani

“pproved by the directors of the League. As a result of this arrar’
Ment there were obtained, during the next months, more th
$100,000 in definite pledges. j

Preliminary drawings and specifications for the lecture hall, a
ministration, auditorium, library, dining-halls, and service builgé:

was: $760,000, - (Since these figures were submitted, there has
another rise of Prices of labor and materials.) To these amoyy,
must be added the power plant with equipment, twelve residencg
a hospital, tunnels for heating-pipes, ete., other outside work and
grading, and other items, on

It was resolved that a joint meeting of the Board of Directo;
with the officers of the L. L. L., the faculty, and the Building Con
mittee be held February 27,

these buildings was $791,000, The earlier estimate on se

At this meeting the situation was again thoroughly gone oy,
and the large gathering, composed of synodical officers and busin,
men of distinction from al] parts of our Synod, endorsed the work:
80 far done by the Building Committee; Since it would be impossib
_to collect the complete amount needed for our Project before Syn
meets, it was resolved that the architect be instructed to submit oth
plans by which it would be possible to construct the buildings neces:
sary for this 8Toup at a cost of one million and a half. The Com:-3
mittee was much pleased to note the spirit in which the architect m :
the situation at Present confronting our Committee, While recoge'g
nizing the difficulty of providing, for the maximum sum mentioned,
®& permanent, practical, and distinctive group for 400 students af the

would make a sincere effort to Provide presentable drawings of
& group not to exceed in cost $1,500,000 for buildings only.

During the following weeks the efforts towards obtaining dona-
‘tions in large amounts were continued. Ag a result, there are now,

which will be availablé if the first designs are adopted, — the expre
sion of a wish, on the part of these donors, that our institution be:

to the eye, but, above all, fire-proof and hence low in cost o:
maintenance, _ ,