Collection › LCMS Convention Proceedings (St. Louis, Missouri) › 1926 · 33rd Convention, Holy Cross Church › Page 237
LCMS Convention Proceedings St. Louis, Missouri — 1926, Page 237
front matter 1
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
Page 63
Page 64
Page 65
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 80
Page 81
Page 82
Page 83
Page 84
Page 86
Page 86
Page 87
Page 88
Sheet 90
Page 90
Page 91
Page 92
Page 93
Sheet 95
Page 95
Page 96
Sheet 98
Page 98
Page 99
Page 100
Page 101
Page 102
Page 108
Page 104
Page 105
Page 106
Page 107
Page 108
Page 109
Page 110
Page 111
Page 112
Sheet 114
Page 114
Page 115
Page 1186
Sheet 118
Page 118
Page 119
Page 120
Page 121
Page 122
Sheet 124
Page 124
Page 125
Page 126
Page 127
Page 128
Page 129
Sheet 131
Sheet 132
Page 182
Page 138
Sheet 135
Page 149
Page 150
Page 151
Page 152
Page 153
Page 154
Page 155
Page 156
Page 157
Page 158
Page 159
Page 160
Page 161
Page 162
Page 163
Page 164
Page 165
Page 166
Page 167
Page 168
Page 169
Page 170
Page 171
Page 172
Page 173
Page 174
Page 175
Page 176
Page 177
Page 178
Page 179
Page 180
Page 181
Page 182
Page 183
Page 184
Page 185
Page 186
Page 187
Page 188
Page 189
Page 190
Page 191
Page 192
Page 193
Page 194
Page 195
Page 146
Page 147
Sheet 149
Page 185
Page 186
Page 187
Page 188
Sheet 190
Page 190
Page 191
Page 192
Page 193
Page 194
Page 195
Page 196
Page 197
Sheet 199
Sheet 200
Page 200
Page 201
Page 202
Page 208
Page 204
Sheet 206
Page 206
Page 907
Page 208
Page 209
Page 210
Page 911
Page 212
Page 218
Page 914
Page 916
Page 216
Sheet 218
Page 218
Sheet 220
Page 220
Sheet 222
Page 222
Page 223
Page 924
Sheet 226
Page 226
Sheet 228
Page 228
Page 929
Page 280
Sheet 232
Page 982
Page 933
Page 234
Page 985
Page 336
Page 237
Page 938
Sheet 240
Page 240
Sheet 242
Page 942
Page 943
Sheet 245
Page 245
Page 246
Page 947
Page 248
Page 949
Sheet 251
Sheet 252
Sheet 253
Sheet 254
Scan: The Lutheran Church—Missouri Synod
⤓ Download page image (full resolution)
Transcription machine transcription, uncorrected
Ev. Luth. Synod of Missouri, Ohio, and Other States. 1926. 237
seems probable. Although numbering less than 100 communicants,
it wanted a church seating about 700 persons. In numerous cases,
congregations numbering less than 200 communicants, and whose
increase in membership had not been great, desired churches seating
twice or three times their communicant membership.
We consulted government statistics and found that the Prot-
estant churches of the United States seat 53,500,000 people, and only
15,000,000 persons attend church with a fair degree of regularity.
In other words, 72 per cent. of the seating capacity of the average
Protestant church lies vacant, except on Christmas Eve and Easter
Day. While the congregations of our circles can show a much higher
average, yet it cannot be denied that much money is often spent
needlessly in seating space that lies idle the greater part of the time.
This leads to a second source of economic waste. If a small
congregation builds a church much larger than necessary, and with
inordinate stress on facilities for social and recreational activities,
it means that it must resort to flimsy structural methods or else go
heavily in debt. Statistics seem to indicate that about $750,000 is
' spent annually, in a church-body the size of ours, in painting and
patching church-buildings, Had these buildings been properly con-
structed at the outset, this enormously high overhead could be re-
duced most decidedly. ;
Believing that much money is spent in building needlessly large
churches and much more in keeping poorly constructed buildings in
repair, we have often advised smaller churches and better construc-
tion. In many instances we have succeeded in this respect.
A vacant pew ten feet long represents an initial cost of from
$1,200 to- $1,400. If a church has ten such pews lying vacant fifty
Sundays a year, it means an initial cost of $12,000 to $15,000. The
interest on that sum of money is from $720 to $900 per year. ;
By building our churches slightly smaller and considerably better
ein materials and workmanship, much money ought to be released each
year for missionary and educational activities. Often the amount of
ae money spent on meaningless elaboration would have made a cheaply
built church durable.
‘r~ For these reasons we have stressed slightly smaller buildings,
thoroughly good structural methods, simplicity of treatment rather
than futile elaboration of detail, and materials that resist as much as
Possible the action of time and weather.
While the sectarian theater-type church has never been popular
in our circles, yet we have met with it in a few cases and have usually
“been successful in persuading the congregations to build a type of
church that more nearly conforms to the traditional churches of
“Lutheran lands. The sects have very largely given up the theater-
style church as a failure. |