Collection › LCMS Convention Proceedings (St. Louis, Missouri) › 1926 · 33rd Convention, Holy Cross Church › Page 82
LCMS Convention Proceedings St. Louis, Missouri — 1926, Page 82
front matter 1
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
Page 63
Page 64
Page 65
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 80
Page 81
Page 82
Page 83
Page 84
Page 86
Page 86
Page 87
Page 88
Sheet 90
Page 90
Page 91
Page 92
Page 93
Sheet 95
Page 95
Page 96
Sheet 98
Page 98
Page 99
Page 100
Page 101
Page 102
Page 108
Page 104
Page 105
Page 106
Page 107
Page 108
Page 109
Page 110
Page 111
Page 112
Sheet 114
Page 114
Page 115
Page 1186
Sheet 118
Page 118
Page 119
Page 120
Page 121
Page 122
Sheet 124
Page 124
Page 125
Page 126
Page 127
Page 128
Page 129
Sheet 131
Sheet 132
Page 182
Page 138
Sheet 135
Page 149
Page 150
Page 151
Page 152
Page 153
Page 154
Page 155
Page 156
Page 157
Page 158
Page 159
Page 160
Page 161
Page 162
Page 163
Page 164
Page 165
Page 166
Page 167
Page 168
Page 169
Page 170
Page 171
Page 172
Page 173
Page 174
Page 175
Page 176
Page 177
Page 178
Page 179
Page 180
Page 181
Page 182
Page 183
Page 184
Page 185
Page 186
Page 187
Page 188
Page 189
Page 190
Page 191
Page 192
Page 193
Page 194
Page 195
Page 146
Page 147
Sheet 149
Page 185
Page 186
Page 187
Page 188
Sheet 190
Page 190
Page 191
Page 192
Page 193
Page 194
Page 195
Page 196
Page 197
Sheet 199
Sheet 200
Page 200
Page 201
Page 202
Page 208
Page 204
Sheet 206
Page 206
Page 907
Page 208
Page 209
Page 210
Page 911
Page 212
Page 218
Page 914
Page 916
Page 216
Sheet 218
Page 218
Sheet 220
Page 220
Sheet 222
Page 222
Page 223
Page 924
Sheet 226
Page 226
Sheet 228
Page 228
Page 929
Page 280
Sheet 232
Page 982
Page 933
Page 234
Page 985
Page 336
Page 237
Page 938
Sheet 240
Page 240
Sheet 242
Page 942
Page 943
Sheet 245
Page 245
Page 246
Page 947
Page 248
Page 949
Sheet 251
Sheet 252
Sheet 253
Sheet 254
Scan: The Lutheran Church—Missouri Synod
⤓ Download page image (full resolution)
Transcription machine transcription, uncorrected
82 Proceedings of Thirty-Third Regular Convention,
tion, ventilation, aud the equipment of all roonis, whether in dor-
mitories or in the a¢ademic buildings, have been purchased and
installed with the sole object in- view of keeping down the cost: of
maintenance and replacement. ep eet ne og
Twelve residences are provided for the professors. These are “4
being built under plans developed by the architect and the . i
Committee. ee er wy a
in order that all this work might be done according to the 4
extremely strict specifications of our architect, the Committee pro- - 4
vided an elaborate system of checks and counter-checks. For the 4
protection of our interests we’ did not only have a capable member ‘a
of the firm of Day & Klauder on the job throughout the years “4
1924-26, but the Committee had its own superintendent on the <4
grounds. Thug all material and labor were checked in the’ most ql
rigid manner that experience and ingenuity can devise. Contracts
were entered into only after a spécial committee had scrutinized .@
them in detail. No extras were ever allowed without the recommen- - Z
dation of a special committee, and then they were voted upon in the 4
entire committee. Payments of money were made with a similar 4
system of checks and safeguards. ae EE ‘
The buildings are equipped with a very elaborate system’ of -
_ steam- and water-pipes and electric wiring, which centers in the
power-house. The power-plant will heat the buildings, as well as
those needed later, up to an enrolment of 800 and will at the same
time provide electricity and power. It is connected by tunnels, 1,500
feet long and 6 feet high, with all the buildings. In the Service
Building a complete set of ranges, refrigerators, and kitchen machin-
ery has been installed. The Seminary has its own ice-plant. In
the Lecture Hall basement a ventilator renews the air for lecture-
rooms, the Assembly Hall, and the Library. ee
The reason for enumerating these items (very roughly, indeed)
is to emphasize the fact that the Committee, throughout the trien- 4
nium, has had in mind to build a college not only beautiful and
stately in style, but above all practical in its appointments and
entailing a minimum of up-keep. Its object was to carry out not
only the letter, but the spirit of the resolutions of 1923, and these
resolutions, after long discussion on the floor, .and ‘after close exami-
nation of blue-prints and architect’s drawings by the delegates, ap-
proved a plan which. would cost more than the alternate Plan B ;
submitted, simply because it represented a more becoming style of. i
architecture. It was the task of the Committee to meet the wish .@
thus recorded and not to make plainness and bare utility its ideal. 3
To carry out, also in equipment and fixtures, the type of building 3