front matter 1 Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 63 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80 Page 81 Page 82 Page 83 Page 84 Page 85 Page 86 Page 87 Page 88 Page 89 Page 90 Page 91 Page 92 Page 93 Page 80 Page 81 Page 82 Page 83 Page 84 Page 86 Page 86 Page 87 Page 88 Sheet 90 Page 90 Page 91 Page 92 Page 93 Sheet 95 Page 95 Page 96 Sheet 98 Page 98 Page 99 Page 100 Page 101 Page 102 Page 108 Page 104 Page 105 Page 106 Page 107 Page 108 Page 109 Page 110 Page 111 Page 112 Sheet 114 Page 114 Page 115 Page 1186 Sheet 118 Page 118 Page 119 Page 120 Page 121 Page 122 Sheet 124 Page 124 Page 125 Page 126 Page 127 Page 128 Page 129 Sheet 131 Sheet 132 Page 182 Page 138 Sheet 135 Page 149 Page 150 Page 151 Page 152 Page 153 Page 154 Page 155 Page 156 Page 157 Page 158 Page 159 Page 160 Page 161 Page 162 Page 163 Page 164 Page 165 Page 166 Page 167 Page 168 Page 169 Page 170 Page 171 Page 172 Page 173 Page 174 Page 175 Page 176 Page 177 Page 178 Page 179 Page 180 Page 181 Page 182 Page 183 Page 184 Page 185 Page 186 Page 187 Page 188 Page 189 Page 190 Page 191 Page 192 Page 193 Page 194 Page 195 Page 146 Page 147 Sheet 149 Page 185 Page 186 Page 187 Page 188 Sheet 190 Page 190 Page 191 Page 192 Page 193 Page 194 Page 195 Page 196 Page 197 Sheet 199 Sheet 200 Page 200 Page 201 Page 202 Page 208 Page 204 Sheet 206 Page 206 Page 907 Page 208 Page 209 Page 210 Page 911 Page 212 Page 218 Page 914 Page 916 Page 216 Sheet 218 Page 218 Sheet 220 Page 220 Sheet 222 Page 222 Page 223 Page 924 Sheet 226 Page 226 Sheet 228 Page 228 Page 929 Page 280 Sheet 232 Page 982 Page 933 Page 234 Page 985 Page 336 Page 237 Page 938 Sheet 240 Page 240 Sheet 242 Page 942 Page 943 Sheet 245 Page 245 Page 246 Page 947 Page 248 Page 949 Sheet 251 Sheet 252 Sheet 253 Sheet 254

Scan: The Lutheran Church—Missouri Synod

⤓ Download page image (full resolution)

Transcription machine transcription, uncorrected

⤓ Download .txt · copy text

Ey. Luth. Synod of Missouri, Ohio, and Other States. 1926. 83

* adopted, yet to do this with minimum maintenance cost and under

the appropriation, was the task which the Committee resolutely set
itself to perform.

One building listed in the appropriation of 1928 was not erected.
The building of a hospital was postponed, due to the fact that we
found the maintenance cost very high, and we were not convinced
that our students would be benefited in proportion to this expensive
up-keep.

The Tower and the monumental Entrance were not included in
the appropriation. The plans called for a temporary arcade, tying

4 up the three buildings which are joined at this point. We received

E.. sufficient extra gifts, however, to build the lower stage of the Tower

and the Main Entrance; cost, $135,000. These accounts were
investigated by a committee of the Board of Directors and proper

, authorization made. The remainder of the Tower may be built when

= sufficient private donations have been received for this purpose.

‘There is at this writing (May 25), after deduction of sums still
due on contracts and estimated expense, an apparent balance of
$43,494.32.

There was available, in appropriations and special gifts,
$2,635,000. Our contracts to date call for $2,211,974.69. There is

. till due, on contractors’ accounts and on various items estimated,

the sum of $394,348.70. The total cost, including Main Entrance
and Reception-room, accordingly is $2,606,333.39. This leaves
a balance of $27,776.61. By various balances and credits this sum
is increased to $48,494.32. The sum of $4,375 is in suspense as
probable refunds to contractors, leaving a net balance on the building
operations for 1924—1926 of $89,119.32.

The expenditures of the triennium included two items which
properly do not belong under Building Fund expense. The topo-
graphical survey of the grounds cost $5,530, and the alternate plan
submitted in Fort Wayne at the request of the Board of Directors
cost $5,754.31. This amount of more than $11,000 should properly
appear in the unexpended balance, but was expended from the
Building Fund rather than burden a treasury less able to bear it.
The reductions made after the Fort Wayne convention not only
brought our contracts in general below the estimated amounts, but
left room for a number of very desirable changes and additional:
improvements. Thus, for the landscaping necessary upon a raw piece
of ground, such as our tract was in 1923, the sum of $6,000 was made
available. For the installation of an auxiliary boiler, by which we
are secure against certain emergencies in our heating-operations and
by which we shall save considerable amounts in fuel during the fall

3