Collection › LCMS Convention Proceedings (St. Louis, Missouri) › 1926 · 33rd Convention, Holy Cross Church › Page 177

LCMS Convention Proceedings St. Louis, Missouri — 1926, Page 177

front matter 1 Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 63 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80 Page 81 Page 82 Page 83 Page 84 Page 85 Page 86 Page 87 Page 88 Page 89 Page 90 Page 91 Page 92 Page 93 Page 80 Page 81 Page 82 Page 83 Page 84 Page 86 Page 86 Page 87 Page 88 Sheet 90 Page 90 Page 91 Page 92 Page 93 Sheet 95 Page 95 Page 96 Sheet 98 Page 98 Page 99 Page 100 Page 101 Page 102 Page 108 Page 104 Page 105 Page 106 Page 107 Page 108 Page 109 Page 110 Page 111 Page 112 Sheet 114 Page 114 Page 115 Page 1186 Sheet 118 Page 118 Page 119 Page 120 Page 121 Page 122 Sheet 124 Page 124 Page 125 Page 126 Page 127 Page 128 Page 129 Sheet 131 Sheet 132 Page 182 Page 138 Sheet 135 Page 149 Page 150 Page 151 Page 152 Page 153 Page 154 Page 155 Page 156 Page 157 Page 158 Page 159 Page 160 Page 161 Page 162 Page 163 Page 164 Page 165 Page 166 Page 167 Page 168 Page 169 Page 170 Page 171 Page 172 Page 173 Page 174 Page 175 Page 176 Page 177 Page 178 Page 179 Page 180 Page 181 Page 182 Page 183 Page 184 Page 185 Page 186 Page 187 Page 188 Page 189 Page 190 Page 191 Page 192 Page 193 Page 194 Page 195 Page 146 Page 147 Sheet 149 Page 185 Page 186 Page 187 Page 188 Sheet 190 Page 190 Page 191 Page 192 Page 193 Page 194 Page 195 Page 196 Page 197 Sheet 199 Sheet 200 Page 200 Page 201 Page 202 Page 208 Page 204 Sheet 206 Page 206 Page 907 Page 208 Page 209 Page 210 Page 911 Page 212 Page 218 Page 914 Page 916 Page 216 Sheet 218 Page 218 Sheet 220 Page 220 Sheet 222 Page 222 Page 223 Page 924 Sheet 226 Page 226 Sheet 228 Page 228 Page 929 Page 280 Sheet 232 Page 982 Page 933 Page 234 Page 985 Page 336 Page 237 Page 938 Sheet 240 Page 240 Sheet 242 Page 942 Page 943 Sheet 245 Page 245 Page 246 Page 947 Page 248 Page 949 Sheet 251 Sheet 252 Sheet 253 Sheet 254

Scan: The Lutheran Church—Missouri Synod

⤓ Download page image (full resolution)

Transcription machine transcription, uncorrected

⤓ Download .txt · copy text

Ev. Luth. Synod of Missouri, Ohio, and Other States. 1926, 177

B. Several questions pertaining to various institutions were left
to the decision of the Board of Directors.

a. Synod in 1923 decided to build the seminary group in St. Louis
according to the so-called Plan No.1, which had the special approval
of the Building Committee, the Board of Directors, and Synod’s
Committee No. 1, while the time when the building was to be under-
taken ‘was left to the Board of Directors in conjunction with the
Building Committee. It should be reported, as a matter of record,
that the contracts were awarded in April, 1924. The corner-stone was
laid October 26, 1994. The Board feels safe that the seminary, when
fully completed, will not cost in excess of the appropriation of
$2,500,000. Since the Building Committee produced evidence that
about $135,000, which came through the regular channels of the
Building Fund collection, had been given for special purposes in
connection with the building of the new seminary, the Board felt
justified in allowing this amount for the main entrance and reception-
room, ‘which had not been included in the plans authorized by the
Synod. All in all, it is marvelous in our eyes that the erection of
such a beautiful and serviceable group of buildings was made pos-
sible through the consecrated gifts of our people. The dedication of
the new seminary, which will then practically be completed, can take
place during the sessions of this Synod, namely, on June 13, 1996,

b. As far as the college in Conover is concerned, two questions
had been left to the Board of Directors to decide, namely, the ques-
tion whether the college should be continued as a synodical institu-
tion, and what the tuition should be for non-ministerial students.’
After President Pfotenhauer had visited Conover, it was decided not
to disturb existing conditions, that is, to retain the college as a
synodical institution. After careful consideration of the tuition ques-
tion it was determined, under consultation with the local board, that
~ the tuition should be $30 for the first two years, $35 for the next
' two years, and $60 for the last two years.
= ce. Regarding the institution at Edmonton, it had been left to the
© Board of Directors to decide whether the college was to be removed
: from Edmonton, and if so, when and to what location. Also the
building operations were entrusted to the management of the Board.
It was first decided by the Board of Directors to leave the institution
® at Edmonton. Then’ the present site was bought and the buildings
- erected, which were dedicated early this year. As far as classes are
concerned, it was decided not to add any classes beyond the so-called
Tertia, until Synod itself can act in the matter.

_ @ All questions pertaining to the institution at Porto Alegre
had been left to the Board of Directors for decision. Our minutes
‘show that considerable time was given to the consideration of the

airs of the South American institution. Among other things it
12