# LCMS Convention Proceedings_St. Louis Missouri_1926_S92 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) Proceedings of Thirty-Third Regular Convention, mendation reads: ‘This arrangement has nothing to do with mental or spiritual matters, but only with physical exercises.. Hence it does not infringe on the domain of Christian education; the exercises, however, promote health. The commanding officer has absolutely nothing to do with the discipline in the institution. We recommend that Synod decline the petition to abolish this arrangement.’ ” Concordia College, Milwaukee, Wis. (Report of Board. Abridged. — German Report, p. 49.) Enrolment showed a steady increase: 1923—24, 238; 1924—25, 269; 1925-26, 297. The professorships authorized in 1923 were filled by calling Professors Paul Koehneke 4nd Paul Zanow. The vacancy caused by the resignation of Prof. Bergmann was filled by calling Prof. Aug. C. Rehwald, Jr. The teaching force at present includes four assistants. The new dormitory was dedicated April, 1925. The new service was opened for use in the beginning of this year. Requests. 1. Four additional professors to provide for the increased en- rolment. oan 2. Renovation of the first dormitory, costing $24,015. 3. A new dormitory, costing $156,880. 4. A gymnasium, costing $66,539. 5. An addition to the administration building, costing $38,800. 6. Alteration in the heating-plant to make it truly a central heating-plant, costing $2,581. 7. Roads and sidewalks, ¢osting $2,572. 8. Rebuilding the old director’s residence into a duplex flat, costing $7,811. Resolved: — ' Action. ; 1. To approve the following excess expenditures: a. For the ser- vice, building, $12,789.57; b. for professors’ residences, $15,000; c. for equipment and improvements, $3,272.23. . 2. To decline the request for a new dormitory and. a gymnasium. _ . 8..To appropriate: a. $2,572 for roads and sidewalks; b. $2,581 for alteration in the heating-plant and $6,000 for an additional boiler ;. c. $8,146 for rebuilding the old director’s residence 3 d. $24,015 for. renovating. the Dormitory No.1; e. $2,276.98 to complete the equip- ment of the service building; f. $425 for fire-hose; g. $10,000 for renovating the southwest dormitory; h. up to $5,000 for grading the sites of the two new dormitories; i. $500 for a bell system; j. $2,500 for a central hot water supply; k. $675 for renovating the laboratory. Items e—k, totaling $20,951.08, were appropriated “subject to the consent of the Board of Directors.”