# LCMS Convention Proceedings_St. Louis Missouri_1884_S34 # AI translation — CHI Digital Archive (demonstration) 34 Proceedings of the 19th General [Synod], or "Since the building committee itself does not absolve itself of all blame regarding the significant excess expenditure, but does explain this excess expenditure and in part justify it; and since, further, the seminary building is certainly a well-executed, fit-for-purpose, and solid building: the reporting committee therefore believes that the congregations concerned" (which had in particular complained about the significant cost overrun of the building) "will be well satisfied by this fact, as well as by the publication of the building committee's report, and that the whole Reverend Synod should not let its joy over the wonderfully beautiful seminary building be clouded by this matter of an excess expenditure — especially since, through our dear congregations' great willingness to sacrifice, the cost debt has already been covered down to a small remainder." (Report of the committee for reporting on the report of the building committee, etc.) After the Synod had heard the foregoing reports of the named committees, a lively debate arose concerning the content of the latter two reports. On one side, the fact stated in the building committee's report — namely, that the first architect bore the main blame for the cost overrun of the building through setting the building sum too low — was called into doubt, and the question was raised whether the main blame did not rather lie in the fact that a young, inexperienced man had been chosen as architect, one who had never before carried out such a building and had therefore made mistakes in some of his calculations. It was further pointed out that two members of the building committee had not signed the report along with the others. When the question was put to them why this had not been done, Dr. Dümling, one of these members, answered that he had not signed the report because he did not agree with all the reasons given in it for the cost overrun. He could not, in particular, absolve the architect of all blame, as the building committee's report did indirectly, but had to say that the main blame for the overrun of the building lay with the architect himself. He, Dr. Dümling, had twice asked the architect, in the presence of the other members of the building committee, how high the building sum would come to, according to his calculation, under the plan he had drawn up, and both times the members of the committee had received the answer: no higher than $85,000. That architect was, to be sure, otherwise a thoroughly capable man in his profession, as the building now standing before us proves; but he had made a number of calculation errors, as a result of which the building sum had been estimated far too low. After the individual contracts had already been concluded — among which, for instance, the one for the joiner's work came to double the sum first estimated — he, Dr. Dümling, once he heard of this, could only raise a protest, since it was too late by then to make any change to the contracts themselves.