# LCMS Convention Proceedings_St. Louis Missouri_1956_S107 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) ealth e for itute ipied esta- td of it to ‘was yera- f the rised. ioard . the 1 we pre- other land there lish- ture. oreed artin idern f fire their e for ivate idate and 1 CSA Se ERM LEED AT EEE CAO ERC SEL DP? EASED Om 8 Ls San eam Re i ct ewe SEMINARIES AND COLLEGES 107 NEW BUSINESS Meeting of the Board Held on January 9, 1956 When informed that the new house would stand 1 meter 25 cm. lower than the street level, we resolved to send three members of the Board up to the place of construction to examine the situation. A water tank is to be installed in Professor Gueths’ house. Minimum room and board which must be paid by the students is Cr. $120,00 per month during the first semester. The Board asks that a bonus of Cr. 6.000,00 be granted to each professor. Dr. Rehfeldt informed us that he is still in good health; for this reason the Board retains him as teacher for 1956. January 26, 1956 Director Goerl informed the Board that Cr. $173.000,00 more would be needed for the construction of the two walls, the raising of the foundation, and the screens of the new professor’s residence. Rev. Harold Ott counseled us to finish the most necessary parts first and to postpone the erection of the walls or fences of the property for the time being. Director Goerl must inform us whether he wishes to retain his post as director in the College Department. If not, another one must be chosen. February 3, 1956 The laundry cost was much more than estimated. The new resi- dence, because of the bad condition of the soil, also will cost much more than the building firm had calculated. A floating cement base must be made. This together with the elevation of the foundation of the house will cost Cr. $40.240,00. The wall on one side of the school will cost 71.620,00, and the one on the other side will cost 49.050,00; the two gates are included in these sums. The screens will cost 8.210,00 and the sidewalk in front of the house 4.050,00. All this was not included in the original estimate. Because of faulty construction a water seepage affecting the study and bathroom of Dr. Schelp’s residence has developed. The repairs will cost 15.800,00. Mr. Tornquist, who will teach in the High School Department, is to receive 2.160,00 a month, student Klagenberg 225,00 and Miss Magdalena Wadewitz Cr. $1.800,00. We bought 50 new classroom chairs. Dr. Rupp will be on vaca- tion during the first semester; in May he is to take a trip to the U.S. for study purposes. The front of the new Seminary building and certain doors must be painted. ; GerorcE J. MUELLER, Secretary