# LCMS Convention Proceedings_St. Louis Missouri_1956_S87 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) SEMINARIES. AND COLLEGES 87 Gratifying results have already been achieved through the func- tioning of this committee. During the past several years teams of staff members paid week-end visits to some of the larger population areas served by our school in order to meet with representative clergy and lay members and to preach in various congregations in the interest of church-service student recruitment. This program was under the direction of our Public Relations Department and made it pos- sible for our faculty members to preach in approximately 150 congregations. Plant Development ‘In the fall of 1953 the Gorman House was renovated and con- verted into a women’s dormitory to house teacher-training students. Cost of renovation totaled $35,809.81, of which $29,227 was received from synodical funds. Taxes amounting to approximately $1,000 annually are still being paid to the village of Bronxville on the lower one-third of the east campus. It is our hope to bring this remaining property into use within the next two years. This will justify our petition for tax exemption. In the fall of 1953 a sprinkler system authorized by the Houston Convention was installed in Bohm Hall, our High School dormitory, at a cost of $8,500. In the summer of 1955 a sprinkler system was also installed in the corridors and stairwells of Sieker Hall, our dormitory for college men. This building is of fireproof con- struction. However, the provisions of the New York State Multiple Housing Law required the protection of sprinklers in public hall- ways. Cost of installation was. $2,500. Sprinkler systems are now installed in all of our dormitories and residence halls. During 1954 renovations were made in the Schoenfeld Gym- nasium, which included the installation of women’s shower rooms, lockers, and lavatories. Total cost, $19,138.24. Final report of the Greater Concordia Fund Campaign, in which $208,000 was pledged in 1951 for furnishings and equipment of the Brunn-Maier Science and Library Building, revealed that almost $200,000 of the pledged amount had been received. In 1953 extensive modernizations in the public rooms of Bohm Hall were approved by Synod at a cost of $28,300 to be completed within this triennium. However, funds were not available for this project. The regrading and repaving of our front oval, approved by the Houston Convention for completion during this triennium, was undertaken in 1955. Cost, including curbing and walks, $6,165. The memory of three men who rendered outstanding service