# LCMS Convention Proceedings_St. Louis Missouri_1956_S47 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) SEMINARIES AND COLLEGES 47 In view of the fact that the two congregations are ready to have the building they plan to erect serve as a demonstration center, or laboratory, for various phases of Christian education and parish administration, it is our conviction that the ministerial training program will gain an invaluable asset in this way. By observation, participation, and consultation, students and faculty members will be able to carry on much wider activities in various areas of prac- tical theology than heretofore. We hope that the convention will give all the encouragement it can to this project. 3. Capital Investments in Campus, Plant, and Equipment. For upwards of two years we have given considerable time and study to the development of an over-all long-range campus-development plan. We are convinced that the opportunities our almighty Lord is placing before our Synod are so great and challenging and the future need for properly educated pastors of such size that the wise and courageous thing to do is to make plans for the fullest possible utilization of our grounds and present facilities and for the addition of such features as will give Synod a well-balanced campus with an optimum capacity for service. We are therefore listing everything that in our estimation is a part of the picture, fully realizing that it will take several triennia to complete the task. Under the continued blessing of God as a prerequisite, and with permissive resolutions on the part of the convention, with the counsel and guidance of the Board for Higher Education and the Board of Directors, and with the support of our entire con- stituency, we trust that the program can be realized in the form in which it will ultimately serve the church best. The itemized list is as follows: a. A dormitory with a capacity of 210 students and a suitable infirmary. This building is planned so that it could be built in several stages, housing one third, one half, or two thirds, and finally the total number. The complete cost is estimated at $905,000. b. A library containing adequate facilities for a professional and graduate school of our size (40,000 square feet of floor space and stack capacity of 150,000 volumes). The cost is estimated at $795,000. ce. A chapel seating 1,000, with all the necessary facilities and equipment for worship and for instruction in Liturgics and Homi- letics, to cost $780,000. d. Additional boilers, other heating equipment, and service lines to new buildings. The cost: $215,000. e. A student personnel services building, to be built in the present gap of the main quadrangle, to house the offices of the