# LCMS Convention Proceedings_St. Louis Missouri_1953_S986 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) 184 SEMINARIES AND COLLEGES within the appropriations made available from the Christ” offering. Synod will wish, no doubt, to assign first Prio, el to these projects since they have already received official approval After a joint meeting on September 23, 1952, the Board of Di rectors informed the Board for Higher Education that it would make available a total of $7,800,000 (65% of $12,000,000) completing the approved projects listed in the 1950 p, as follows: Repayment of advances to complete the “Building for Tomorrow” projects: To Postwar Reserves ___ To repay loans (advanced from available balances) ~~ * 27000009 — 772,782.59 $1,002,78059 Prepayments: 02, Austin.. Excess cost over estimate $ 2,697.21 Bronxville, Parking lot nD Fort Wayne. Convert residence to dormitory 20,000.00 Fort Wayne. Equipment nS . Oakland. Plastering “17,962.00 Portland. Residence oh 20,000.00 Portland. Luther H: ——_—————_——— 3,300.00 Portland. Four lots — 2,800.00 Portland. Excess cost over estimate 17,609.48 River Forest, Advance planning for multiple . ousing 2,500.00 River Forest, Off-campus residence ___ 20,000.00 River Forest, Off-campus multiple-unit housing “Excess Gnnooee 45,000.00 River Forest, Excess cost over estimate 14,283.41 St. Louis. Dormitory __ ——--—..._ 53,899.86 St. Louis. Dormitory SU - 57,672.43 St. Louis. Excess cost over estimate on Graduate Building _ ———-_.__ 6,199.78 St. Louis. Equipment aa 10,099.50 St. Louis. Converting to city electricity ——~-— 18,000.00 St. Louis. Furnish dormitories — 28,000.00 Springfield. Convert residence 2,625.18 349,176.85 $1,391,959.37 NET TOTAL available for allocation to remaining projects: $7,800,000.00 1,391,959.37 $6,408,040.63 Senior College. Your Board proceeded, therefore, to reserve the sum of $3,000,000 for use in construction of the Senior College and byothe SEMINARIES AND COLLEGES 185 land for it. This sum represents the amount designated of vaukee Convention, plus $250,000 for land, with n Miwa icrease in costs since the original estimates were pigeld for ie increase in capacity of the school, and for other made, or fo vas furnishings, equipment, architects! fees, ete. of the isems, 50 i e necessary priorities for distri uu ion side establish ible the Board accepted the following order of mai ’ Ee orm ce at St. Louis. . Donnitory space for women at the teachers’ colleges and at 2 vovarateny institutions at which Synod has approved a train re those P am for women teachers. ; lief for the ne Othe Senior College, to provide long-term re : * ion at St. Louis. . : bose vision for services not presently available on a given one ibraries ; poraitories for men at ministerial colleges. i isting facilities. t and expansion of existing i ; Tens “deferred by the Milwaukee Convention. the basis of this Board’s recommendation the pavance of th vicinal appropriation was allocated by the Board of Directors e 0 as follows: __§ axso0a St. Louis — —— $ BB000 River Forest — 368/000 50,000 132,000 110,000 200, $3,349,000 Of the grand total originally made available (65% of $12,000,000), .63 was held in reserve for contingencies. ee a noted that, of the items approved by re Milwaukee Convention, it has been impossible to Duaid the addition “untae eded at River Forest, the a tio: ‘ for help at Milwaukee, and the business office facilities which were planned as a part of the dormitory at St. Louis (these acl ties would also release the. urgently needed vere dene ne nen i i c ; the women’s ; cupied by the business offices) ; 1 vO lant to oll oneration nd; and to convert the St. Louis heating plan atio rand and they were already approved at’ Milwaukee, the facilities