# LCMS Convention Proceedings_St. Louis Missouri_1947_S146 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) 144 SEMINARIES AND COLLEGES of theology (graduated from Crespo 1945), and (c) a class in 5th year of pretheological work (Secunda). The health of the student body during the triennium was exceptionally good. There was not a single case of serious sickness. The deportment of the students was likewise excellent, and all applied themselves to their studies with great diligence. The graduating class of 1946 gave very much assistance to the different local congregations by preaching and Sunday school teaching. In November, 1946, our Argentine Lutheran Church celebrated another great vic- tory, namely, the graduation of another five well-trained laborers in the Kingdom. All five have been placed in important positions. Housing.— The housing of the professors and students did cause us much headache during the triennium. After Christmas, 1944, we were obliged to move, since the houses we were occupy- ing had been sold. Since our future seminary is to be located at Villa Ballester, a suburb of Buenos Aires, we rented an 8-room house there. Because of the fact that the family of Professor Lehenbauer was willing to live in rather crowded conditions, we located the classroom, the home for five students, and the pro- fessor all under this one roof. Thus we were saved the expense of renting a second house, which we probably would not have found, since houses were at very high premium. For the new school year, 1946, we needed another house for the newly called director. Thanks to God, one was found. Classes of the college department had already begun, and yet no home for the students had been discovered. When the seminary classes were to open, a home was found and rented. The rent for the seminary of course is high, since we were obliged to rent four homes, two smaller ones and two larger ones. We had hoped that when the 1946 school year began, our own seminary buildings would be ready; but since Synod’s Board of Directors had such a large building program to manage, they could not give us the sign to go ahead, because, as far as Argentina was concerned, building operations could have begun in January, 1945, and been easily finished by the end of that year. It was easier to get building materials in 1945 than in 1946 and 1947, at much lower prices, and many of them of better quality. Thousands of dollars could have been saved. ; Finally, in June, 1946, we received the order to begin building operations. Since then our building committee has been excep-~ tionally busy. When all the plans and preliminaries were fin- ished, we were in November, 1946. Since then work has been going on. On February 2 the cornerstone of the main building was layed in a special service of praise and thanksgiving. When Synod convenes, the walls and roofs of the main building and the three residences will be finished, if no unforeseen obstacles set in.