# LCMS Convention Proceedings_St. Louis Missouri_1947_S114 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) 114 SEMINARIES AND COLLEGES Concordia Academy, Portland, Oregon (Memorial 111) The past triennium has witnessed the beginning of a new era for our Portland Concordia. With its continued existence guaran- teed by action of the Saginaw Convention of 1944, the institution has now been able to devote all its attention toward the strength- ening of its program and the expansion of its facilities. Building Program Construction of the new dormitory authorized by Synod was begun on July 1, 1946. The cornerstone was laid with appropriate ceremonies on November 17, 1946. As this report is written, the construction work is in its final stages, and the dormitory will be ready for occupancy, God willing, at the beginning of the new school year, i.e., September, 1947. The dormitory is of reinforced concrete, fireproof construction, with brick veneer exterior, with two stories and full basement. The building consists of 20 suites (bedroom and study room), each of which will accommodate four students — a total capacity of 80 students. Through special action of the synodical Board of Directors a heating plant has been erected on the campus at the cost of ap- proximately $18,000. This plant has been equipped to serve the entire campus, including both the new dormitory and such other buildings as will be erected in the future. By resolution the Oregon and Washington District at its 1946 convention pledged itself to raise $60,000 for a building fund for Concordia Academy among the congregations of the District. To date the moneys thus collected approximate $90,000. The original $60,000 has been designated for the first unit of an administration building, and the remainder has been earmarked for the gym- nasium, landscaping, and other campus improvements for which Synod makes no provision. Construction work on the administration building will begin this summer; the “old building,” which has housed both dormitory and classroom facilities since its erection in 1907, will be razed in order to make room for the new building. The first unit of the administration building (consisting of the first floor and basement) is to be constructed with District funds. This, however, will not fully take care of Concordia’s instructional and administrative needs. Since it is highly desirable to provide more classroom space, as well as adequate library and chapel facilities, at the earliest possible moment if these important phases of our program are not to be impaired, the Board of Control makes the following request: That Synod authorize the completion of the entire administration building, according to the plans submitted, for the sum of $110,000.